Pilot

One store, one period, objective criteria

The pilot shows, in a real store, what the product delivers before an annual contract. It is paid, and the fee becomes credit if the store moves on to the contract.

Format

One store

With the cameras already in place, after an approved technical visit.

60 to 90 days

Fixed price; the fee becomes credit if the store moves on to the annual contract.

Cadence

A meeting every two weeks with whoever owns the pilot on the retailer's side, and a monthly report.

Scope

Indicators and Digital Twin, according to the product phase at the time.

How the pilot runs

  1. Before starting
    Contract and technical visitPilot contract and data processing agreement signed, and an approved technical visit.
  2. First week
    DeploymentTarget of up to five business days, to be validated in the pilot.
  3. 60 to 90 days
    Follow-upA meeting every two weeks and a monthly report.
  4. At the end
    Final reportThe measured result and the decision to move on or not.

Prerequisites

  • Signed pilot contract and data processing agreement.
  • Privacy checklist completed before go-live.
  • Approved technical visit, with cameras within specification.

Success criteria

CriterionTarget
Counting accuracyA difference of up to ±5% from a manual count, in agreed samples
Processing coverageAt least 90% of the agreed hours processed on time
Useful findingsThree or more, recorded and confirmed by whoever owns the pilot on the retailer's side
Tested decisionAt least one operational or layout change decided with pilot data
AdoptionWeekly use by the manager or analyst

The targets above are engineering goals to be validated in the pilot, not contractual guarantees.

How accuracy is checked

At least three one-hour periods, on different days and times, counted by hand by a person from the customer and checked against the video. The comparison is recorded in the report. A difference above the target triggers a correction plan and a new measurement.

Data during the pilot

Processing is the same as in production: there is no test mode with less privacy. At the end, the data is deleted or formally migrated, as decided by the controller.

Closing

  • If the store moves on: final report and an annual contract proposal, with the pilot fee as credit.
  • If it does not: report, export of totals, proven data deletion and a retrospective.
Conversation

Tell us what you want to solve

Tell us about the operation, the process or the store. We reply within two business days with next steps, no commitment.